Projecten

Foto: Omni Architecten
Project

DC Smart Logistics fase 2

It concerns a sustainable state of the art distribution centre of approx 9209 m2 in 's-Hertogenbosch. The distribution centre is located next to in the centre of the Netherlands, which is a perfect place for a logistics company.

The distribution centre is developed in to a new state-of-the-art facility that meets all the modern requirements and is also focussing on sustainability (amongst others gas-free).

The distribution centre is built according the BREEAM-NL New Build, whereby the basic principle for certification level will be excellent. The complex is being developed on a plot of approximately 13304 m².

“DC Smart Logistiscs Den Bosch" is developed in accordance with all the modern specifications for a distribution centre such as

  • Gas free, all electric operated warehouse;
  • Concrete wall base around the building of at least 2.5 meter above the warehouse floor;
  • Super flat concrete floor;
  • Maximum floor load capacity of 5,000 kg/m2